Build Updates

  • Cockpit Sills and Gussets

    Also fit around the time of the aft deck was the cockpit sills and gussets. These pieces, which haven’t been touched much since the…

    more…

  • Aft Deck

    The aft fuselage deck, or stabilizer deck, was fitted. This required leveling the whole fuse–which was 90% there from the careful work done during…

    more…

  • The Big Flip!

    After some final riveting, the time had come for the big flip. Originally only two of us were going to attempt this, but required…

    more…

  • Gear Leg Fuselage Exit

    This hole in the bottom of the fuse drove me nuts. It’s incredibly close to a rivet (edge-distance aside, I’m nearly shaving the factory…

    more…

  • So Close…

    I’m getting so close to having this portion done. One-to-two more riveting sessions with a partner and I’ll be ready to tip the canoe.…

    more…

Avionics Baffles Baggage Brakes Bulkheads Cabin canopy Cockpit Controls Control Surfaces Cowl Cowling Elevator Empennage Engine Fairings Fiberglass Finishing Finishing Kit Firewall Firewall Forward Flaps Forward Cockpit Fuel Delivery Fuel Tank Fuselage FWF Harness Landing Gear Lighting Oil Cooling Panel Pitot Rudder Seats Skins Skirts Slider Stabilizer Systems Trim Tab Windscreen Wing Wings Wiring