Tag: Fuselage
EP3.15 Forward Fuselage Fabrication
EP3.13 Forward Fuselage Structure
EP3.12 Fitting the Firewall
EP3.11 Joining the Fuselage
EP3.10 More Middle Fuselage
EP3.9 Middle Fuselage
EP3.8 Riveting the Aft Fuselage
SE 1 One Year of Building
A special episode looking back at one year of building.
EP3.7 Priming an Airframe
The following is a write-up provided by Doug G. His detailed narrative of priming is helpful for anyone in the research or production phase of building an aircraft, particularly those priming with Akzo Nobel, such as me. As always, this should not be misconstrued as instruction, direction, or advice. I, nor Doug, accept any responsibility […]