Build Updates

  • Flap Mechanism

    Time for flaps. This step required fabrication a few little bits. Once the brackets were produced, things moved along fairly quickly. First was installing…

    more…

  • Let’s Make Some Seats

    Seats! Need somewhere to sit in this thing. I’ve been looking forward to seats for a while. They’d make visualizing flying this airplane that…

    more…

  • Tunnel Cover

    The tunnel cover was largely fabricated with the seat bottoms. The two pieces of Z-extrusion were cut to the specified dimensions, including several angled…

    more…

  • More Seat Bottoms

    Continuing on, I “dry fit” the forward seat floors, checking that all the screws fit. They fit snug, with no adjustment necessary. All that’s…

    more…

  • Seat Floors

    Seat floors were fabricated, including the seat back mounts (three hinge pieces riveted to bottom of seat). Fairly uneventful, and came out looking great.…

    more…

Avionics Baffles Baggage Brakes Bulkheads Cabin canopy Cockpit Controls Control Surfaces Cowl Cowling Elevator Empennage Engine Fairings Fiberglass Finishing Finishing Kit Firewall Firewall Forward Flaps Forward Cockpit Fuel Delivery Fuel Tank Fuselage FWF Harness Landing Gear Lighting Oil Cooling Panel Pitot Rudder Seats Skins Skirts Slider Stabilizer Systems Trim Tab Windscreen Wing Wings Wiring